Dental Restoration
Dental Labrotary
Lower Right the 1st Molar, Immediate Placement of an Implant
HAPPYTOGETHER
Views : 607/ Oct, 27, 2022
Views : 607/ Oct, 27, 2022
65-year-old female patient
1. pre-op panoramic radiograph
2. Intra-oral view after removal of old crown. It seemed hopeless.
3. Tooth extraction.
4. ARUM implant system surgery kit
5. Serial drilling was given.
6. Osteotomy site
7. Arum NB1 Ø5/L10mm
8. The implant is in the final position.
9. The Direction-Pin was screwed into the fixture to verify the 3-dimensional position.
10. GBR (Xenograft)
1. pre-op panoramic radiograph
2. Intra-oral view after removal of old crown. It seemed hopeless.
3. Tooth extraction.
4. ARUM implant system surgery kit
5. Serial drilling was given.
6. Osteotomy site
7. Arum NB1 Ø5/L10mm
8. The implant is in the final position.
9. The Direction-Pin was screwed into the fixture to verify the 3-dimensional position.
10. GBR (Xenograft)
11. A healing abutment inserted in the collagen membrane was connected to the fixture.
12. Post-op ppanoramic radiograph.
13. ISQ reading after 2 months of implant placement.
14. After the ISQ reading, the healing abutment was engaged again.
15. Customized Abutment and Zirconia crown
16. abutment connection
17. The crown was cemented permanently and the access hole was filled with composite resin.
18. Panoramic radiograph view after crown delivery.
19. CBCT scanned images.
I will upload the video later when the editing of the surgery video is completed.
0
There are no registered comment.