Maxillary Sinus Graft, 2 Implants, Crown Contouring
HAPPYTOGETHER
Views : 1,283/ Jan, 20, 2023
Views : 1,283/ Jan, 20, 2023
<GCaks> A 56-year-old male patient had pain-inducing caries, and perio-involved tooth mobility resulted in a tooth fracture at 1st molar. And it was removed months ago. He was a heavy smoker and showed poor oral hygiene.
▲Pre-op panoramic radiograph.▲Intraoral view before the maxillary sinus graft▲Lateral window using reamer▲Sinus membrane elevation procedure with all-in-one sinus curette.▲Bone material(Xenograft) was applied into the prepared sinus cavity.▲Absorbable collagen membrane was placed on the grafted site. (Lyoplant®)▲Suture was done (Nylon 4-0)▲Radiograph was taken right after maxillary sinus graft▲CBCT after 1month of maxillary sinus graft▲4 months after sinus graft. Intra-oral view on the day of implant surgery. It was scheduled that the 2nd molar extraction and 2 implants would be placed in the 1st and 2nd molar zone.▲The 2nd molar extraction ▲Insertion torque was 35Ncm at the 1st molar zone. Arum NB1, 5*10▲Lateral view. Check the 3-dimensional position and occlusal relationship with the Arum direction pin.▲Occlusal view. Check the 3-dimensional position and occlusal relationship with the Arum direction pin.▲Insertion torque at the 2nd molar zone was 20Ncm. Arum NB1, 5*10▲A healing abutment was connected to the immediately placed implant▲GBR was performed at the immediately placed area. Xenogrtaft+CGF▲CGF was placed on the grafted area▲A membrane-engaged healing abutment was re-screwed into the fixture after unscrewing it.▲The flap was closed.▲ A panoramic radiograph after 2 implants were placed in the right maxilla.▲CBCT scan image focused on the 2nd molar zone.▲CBCT scan image focused on the 1st molar zone.▲4 months after implant placement. Intraoral view on the day of implant uncovery(2nd surgery).▲4 months after implant placement. Implant uncovery and ISQ reading was performed. ISQ values at the 1st molar area.▲ISQ values at the 2nd molar area.▲After the ISQ reading, the healing abutment was engaged to the fixture.▲When viewed from the side, the embrasure area was not opened enough. That should be re-contoured.▲The embrasure area was re-contoured.▲Abutments were connected to fixtures▲Seating trial ▲ Intra-oral view after delivery (permanent cementation and access hole filling with composite resin).▲CBCT scan focused on 1st molar area after crown cementation▲CBCT scan focused on 2nd molar area after crown cementation.
0
- PrevImplant in the molar zone of both jawsJan, 20, 2023
- NextIn the anterior maxilla, implant-supported fixed partial denture. Jan, 20, 2023
There are no registered comment.